📍 Hialeah, FL · ADU & Garage Conversion

Hialeah ADU & Garage Conversions — Chapter 98 Compliant, Fully Permitted

From garage conversion to fully detached accessory dwelling unit. Design, Miami-Dade NOA product approvals, permits, construction, and certificate of occupancy — all under one licensed GC contract, built to the state's toughest wind code.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 HVHZ 175 mph Rated CO Guaranteed Now Serving Hialeah
Serving Miami · Hialeah · Homestead · Kendall · Doral · Coral Gables · Miami Gardens · Cutler Bay and all of Miami-Dade County
✓ Florida Licensed GC · CGC1531095
✓ NOA Product Approvals Handled
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
★★★★★ 5-Star Rated
Exterior Example ADU exterior finish, representative style for Miami-Dade County
Interior Example ADU interior finish, representative style for Miami-Dade County

Representative example finishes for illustration — not a specific completed project.

How it works

From idea to certificate of occupancy

ADUs involve zoning review, NOA-compliant drawings, structural engineering, multiple permit departments, and a final CO inspection. We manage the entire process under one contract — you don't project-manage it.

01

Feasibility & vision

We review your lot, zoning jurisdiction (unincorporated county vs. one of Miami-Dade's 34+ cities), setbacks, utility connections, and flood elevation before you spend a dollar on drawings.

02

Design & permit

Architectural drawings, HVHZ structural engineering, and Miami-Dade NOA product selection for every window, door, and roofing component. Permit fees included in written scope.

03

Construction

Foundation, framing, roofing, electrical, plumbing, insulation, drywall, flooring, kitchen or kitchenette, bathroom — all trades coordinated under our GC license.

04

CO & handoff

Final inspections across all trades, CO issued by the correct jurisdiction. You receive a completed, legal dwelling unit with a certificate of occupancy — ready to rent or move family in.

What we build in Miami-Dade

ADU types — from garage conversion to detached build

Garage conversions are the fastest and most cost-effective ADU option in Miami-Dade. Detached ADUs on larger lots in Kendall, Homestead, and unincorporated areas offer more flexibility and rental income potential. We build both to HVHZ standard.

Garage conversion

Convert your existing attached or detached garage into a legal, permitted living space. We handle the floor leveling, insulation upgrade, mini-split HVAC, electrical panel sub-feed, plumbing rough-in for a kitchenette and bathroom, and CO application. Most efficient ADU path in Miami-Dade.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

A standalone dwelling unit built on your lot — separate from the main house. New foundation, HVHZ-rated structural system, its own utility connections, kitchen, bathroom, and CO. Best option for maximizing rental income or creating a fully independent living space for family.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

Already have a builder but need help getting through Miami-Dade's RER permitting process or a city building department? We provide architectural drawings, HVHZ engineering, NOA product documentation, permit submission, and project management through CO — without doing the construction ourselves.

Architectural drawingsHVHZ engineeringPermit managementNOA documentation

Honest pricing

ADU costs — Miami-Dade 2026

ADU costs in Miami-Dade run higher than most of Florida because every exterior product must carry a Miami-Dade NOA or HVHZ-rated Florida Product Approval, and land/labor costs in the county are among the state's highest. These ranges include design, permits, and CO — not just construction. We quote the total project cost in writing before you commit.

$45K – $70K
Garage conversion

Existing structure

Convert an attached or detached garage into a legal ADU. Fastest path to a CO'd unit in Miami-Dade — existing structure, existing roof, existing footprint.

  • Design and permit drawings
  • Floor leveling and insulation
  • Plumbing rough-in + bathroom
  • Electrical and mini-split
  • Certificate of occupancy
$130K – $200K+
Large or custom ADU

Full dwelling unit

800–1,200+ sq ft detached ADU with full kitchen, 1–2 bedrooms, 1–2 bathrooms, laundry hookup, and high-spec finishes. Designed for long-term rental income or a permanent family suite.

  • Up to 1,200 sq ft
  • 1–2 bed / 1–2 bath
  • Full kitchen with appliances
  • Washer / dryer hookup
  • Premium finishes
  • Full CO and documentation

Miami-Dade County · What property owners need to know

Why ADU permitting in Miami-Dade requires a licensed GC

ADU projects in Miami-Dade touch the state's strictest wind code, a patchwork of 34+ incorporated cities, and coastal flood review. A handyman or unlicensed contractor cannot legally manage this.

175 mph HVHZ Design Wind Speed

Miami-Dade sits in Florida's High-Velocity Hurricane Zone with a 175 mph design wind speed — the highest in the state, higher even than Broward's 170 mph. Every window, door, garage door, and roofing product must carry a Miami-Dade Notice of Acceptance (NOA) from the County's Product Control Section. Using a non-rated product is a code violation that can block your CO at final inspection.

Chapter 98: No Owner-Occupancy Mandate

Hialeah regulates ADUs under Chapter 98 (Zoning) of its own Code of Ordinances, separate from unincorporated Miami-Dade — size, setback, and parking standards vary by district (R-1, R-2, R-3). Unlike several neighboring cities, Hialeah does not require owner-occupancy of the main house or the ADU, which opens the door for investment-property ADUs. We confirm your district's specific standards before any design work begins.

DERM & Flood-Zone Review

Properties near canals, wetlands, or coastal flood zones often require review by Miami-Dade's Department of Environmental Resources Management (DERM) in addition to standard building permits — covering septic/well setbacks, flood elevation (base flood elevation plus freeboard), and king-tide resilience requirements that are more aggressive in Miami-Dade than inland counties. We identify DERM-triggering conditions during the feasibility step, not after drawings are paid for.

County Impact Fees Still Apply

Even though Hialeah runs its own zoning code, ADUs here are still subject to Miami-Dade County impact fees under County Code Chapter 33E — covering roads, schools, parks, police, and fire — tied to the new dwelling unit, on top of the city's own building permit and plan-review fees. We include both fee layers in your written scope before you sign.

The CO is What Matters

The certificate of occupancy is what makes an ADU legal to rent or occupy. Unpermitted "in-law suites" have no legal standing and create serious liability when you sell or insure the property — and are a frequent code enforcement target in dense Miami-Dade neighborhoods. Every ADU we build targets a CO at close-out.

One Contract, Soup to Nuts

We provide HVHZ-compliant architectural drawings, manage the permit across whichever of the 34+ jurisdictions applies, coordinate all trades, and deliver the CO. You have one contract and one point of contact — not a separate architect, engineer, plumber, electrician, and framer you hired off Craigslist.

On the Ground in Hialeah

What ADU builders navigate in Hialeah

We bring the same feasibility-first ADU process we built across South Florida to Hialeah's Chapter 98 code. Here is what shapes every project in this city.

Chapter 98 Requirements

  • Permitted in single-family and multi-family districts (R-1, R-2, R-3)
  • Size, setback, and parking standards vary by district
  • No owner-occupancy mandate
  • Subject to Miami-Dade County Chapter 33E impact fees
  • Reviewed by Planning & Zoning Division, (305) 883-8075

Typical Timeline

  • Feasibility + jurisdiction review: 1–2 weeks
  • Architectural drawings + HVHZ engineering: 4–8 weeks
  • Permit submission and review: 4–14 weeks (varies by jurisdiction)
  • Construction — garage conversion: 8–14 weeks
  • Construction — detached ADU: 16–30 weeks
  • Final inspections + CO: 1–3 weeks after construction complete

Cost Variables to Know

  • Impact fees: capped at single-family rate under FL HB 1339, generally $5,000–$15,000
  • School impact fee: approximately $3,000–$5,000
  • Utility connection (sub-panel, water, sewer): $4,000–$15,000
  • HVHZ architectural drawings + engineering: $7,000–$20,000 (included in our scope)
  • Permit fees: $1,500–$4,000 (included in our scope)

Common Use Cases

  • Rental income unit — single-family neighborhoods in West Hialeah and Palm Springs North
  • In-law or family suite — Hialeah Gardens-adjacent primary homes
  • Investment property ADU add — no owner-occupancy requirement makes this straightforward
  • Garage-to-ADU conversion — dense residential lots throughout central Hialeah

Hialeah's biggest advantage over several neighboring cities is the absence of an owner-occupancy requirement — that makes it a straightforward choice for an investment-property ADU. The first question on every Hialeah inquiry is still which Chapter 98 district (R-1, R-2, or R-3) your parcel sits in, since size and setback standards vary. We confirm that in week one, before a single drawing is started.

From there, the HVHZ wind code and Miami-Dade County's Chapter 33E impact fees are what shape the budget. NOA-rated windows and doors are required on every opening, and the county fee layer applies on top of the city's own permit and plan-review fees. We price the real number against your specific parcel before you sign anything.

Service Area

ADU & garage conversions throughout Hialeah

From West Hialeah to Palm Springs North — Hialeah is part of our Miami-Dade County market, backed by 10+ years of licensed GC experience in South Florida.

West HialeahPalm Springs NorthHialeah Gardens AreaOkeechobeeMeadowlakeTwin Lakes
Real Miami-Dade Clients

What property owners say about our ADU work

Verified reviews from ADU and garage conversion projects across Miami-Dade County.

★★★★★

"We didn't know our windows needed Miami-Dade NOA approval, not just a regular Florida product sticker. D&Co caught that before it became a problem at inspection. CO in hand 8 months after we first called."

RC

Rafael C.

Kendall — Detached ADU, 680 sq ft

★★★★★

"Garage conversion in Hialeah. D&Co handled the drawings, the permit through the city, all the trades, and the CO. My parents moved in within 5 months. Knowing the full cost upfront mattered most."

MG

Marisol G.

Hialeah — Garage Conversion to ADU

★★★★★

"I rent the unit out long-term near Cutler Bay. The total project cost was $98,000. Two other contractors couldn't explain the DERM review for my canal-adjacent lot. D&Co walked me through it before we signed anything."

DT

David T.

Cutler Bay — Detached ADU, 610 sq ft rental

Common questions

What Hialeah homeowners ask about ADUs

The process, the cost, what needs an NOA, and what makes an ADU legal to rent in Miami-Dade.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning, NOA requirements, and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬