📍 Hollywood, FL · ADU & Garage Conversion

Hollywood ADU & Garage Conversions — CCCL-Aware, Fully Permitted

From garage conversion to fully detached accessory dwelling unit. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Broward County code.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 Design-Build in One Contract CO Guaranteed Now Serving Hollywood, FL
Serving Fort Lauderdale · Hollywood · Pembroke Pines · Coral Springs · Miramar · Davie · Plantation · Sunrise · Deerfield Beach · Pompano Beach and all of Broward County
✓ Florida Licensed GC · CGC1531095
✓ Design + Permits Included
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
★★★★★ 5-Star Rated
Exterior Example ADU exterior finish, representative style for Broward County
Interior Example ADU interior finish, representative style for Broward County

Representative example finishes for illustration — not a specific completed project.

How it works

From idea to certificate of occupancy

ADUs involve zoning review, architectural drawings, engineering, multiple permit departments, and a final CO inspection. We manage the entire process under one contract — you don't project-manage it.

01

Feasibility & vision

We review your lot, zoning, setbacks, utility connections, and HOA restrictions before you spend a dollar on drawings. We tell you what's buildable before anyone gets excited about floor plans.

02

Design & permit

Architectural drawings, structural engineering, and permit submission. We manage the back-and-forth with the Building Division, Zoning, and any required HOA approvals. Permit fees included in written scope.

03

Construction

Foundation, framing, roofing, electrical, plumbing, insulation, drywall, flooring, kitchen or kitchenette, bathroom — all trades coordinated under our GC license.

04

CO & handoff

Final inspections across all trades, CO issued by the county. You receive a completed, legal dwelling unit with a certificate of occupancy — ready to rent or move family in.

What we build in Broward County

ADU types — from garage conversion to detached build

Garage conversions are the fastest and most cost-effective ADU option in Broward County. Detached ADUs on large lots offer more flexibility and rental income potential. We build both.

Garage conversion

Convert your existing attached or detached garage into a legal, permitted living space. We handle the floor leveling, insulation upgrade, mini-split HVAC, electrical panel sub-feed, plumbing rough-in for a kitchenette and bathroom, and CO application. Most efficient ADU path in Broward County.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

A standalone dwelling unit built on your lot — separate from the main house. New foundation, full mechanical systems, its own utility connections, kitchen, bathroom, and CO. Best option for maximizing rental income or creating a fully independent living space for family.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

Already have a builder but need help getting through the Broward County permit process? We provide architectural drawings, engineering, HOA approval coordination, permit submission, and project management through CO — without doing the construction ourselves.

Architectural drawingsEngineeringPermit managementHOA coordination

Honest pricing

ADU costs — Broward County 2026

ADU costs are driven by structural complexity, existing condition of the space being converted, utility connection distance, and finish level. These ranges include design, permits, and CO — not just construction. We quote the total project cost in writing before you commit.

$40K – $65K
Garage conversion

Existing structure

Convert an attached or detached garage into a legal ADU. Fastest path to a CO'd unit in Broward County — existing structure, existing roof, existing footprint.

  • Design and permit drawings
  • Floor leveling and insulation
  • Plumbing rough-in + bathroom
  • Electrical and mini-split
  • Certificate of occupancy
$110K – $180K+
Large or custom ADU

Full dwelling unit

750–1,200+ sq ft detached ADU with full kitchen, 1–2 bedrooms, 1–2 bathrooms, laundry hookup, and high-spec finishes. Designed for long-term rental income or a permanent family suite.

  • Up to 1,200 sq ft
  • 1–2 bed / 1–2 bath
  • Full kitchen with appliances
  • Washer / dryer hookup
  • Premium finishes
  • Full CO and documentation

Broward County · What property owners need to know

Why ADU permitting in Broward County requires a licensed GC

Broward County amended its zoning code in 2023 to permit ADUs — but only in specific districts, with real size caps and an owner-occupancy rule. Getting it wrong at the zoning stage is the most expensive mistake on an ADU project.

1,000 Sq Ft Cap, CCCL-Aware Design

Hollywood caps detached ADUs at 1,000 sq ft or 50% of the primary dwelling, whichever is less, with 5 ft minimum side setbacks and 5–10 ft minimum rear setbacks, and a maximum height of 25 ft. Properties near the beach or the Intracoastal Waterway may also fall under the Coastal Construction Control Line (CCCL), adding flood and wind provisions on top of standard Florida Building Code requirements. We confirm your parcel's rules before any design work begins.

HVHZ Wind Code — Up to 170 mph

Broward sits inside Florida's High-Velocity Hurricane Zone, with ultimate design wind speeds running as high as 170 mph depending on exposure and distance from the coast. Every window, door, garage door, and roofing product needs a Miami-Dade or Broward County Notice of Acceptance (NOA) on file — a standard non-rated product isn't legal to install. We spec NOA-rated materials from the first drawing, not as a change order after a failed inspection.

A Barrier Island City

Hollywood's building department reviews permits separately from unincorporated Broward County, and its barrier-island and Intracoastal Waterway geography adds flood zone and coastal construction exposure that inland Broward cities don't face — plus condo/townhome HOA density along the beach corridor, which means many projects run into association restrictions on setbacks, exteriors, and rooflines. We review the city's code and your HOA's CC&Rs before you spend a dollar on design.

Sewer Tap Fees: $3,000–$12,000

Detached ADUs need a new electrical sub-panel or meter, a water connection, and a sewer tap — and in Broward County that tap fee alone runs $3,000–$12,000 depending on which city's utility provider serves your address. We put the actual number in your written scope before you sign, not a rough estimate you discover at permit issuance.

No CO, No Legal Rental

An unpermitted "in-law suite" can't be legally rented, has no standing at resale, and can jeopardize your homeowner's insurance. We build every Broward County ADU toward a certificate of occupancy at close-out — the permit timeline is ours to manage, and the project isn't done until the CO is in your hands.

One Contract, Soup to Nuts

Zoning confirmation, architectural drawings, permit submittal, trade coordination, and the CO — all under one contract with one point of contact, instead of a separate architect, engineer, plumber, electrician, and framer you sourced yourself. That's the design-build advantage for a zoning-restricted project like this, now available across Broward County.

On the Ground in Hollywood, FL

What ADU builders navigate in Hollywood

We bring the same feasibility-first ADU process we built across Broward County to Hollywood's coastal code. Here is what shapes every project in this city.

Hollywood ADU Standards

  • Detached ADUs capped at 1,000 sq ft or 50% of primary dwelling, whichever is less
  • Attached ADUs capped at 50% of the primary dwelling's floor area
  • Minimum setbacks: 5 ft side, 5–10 ft rear; max height 25 ft
  • Beach and Intracoastal-adjacent lots may trigger CCCL review
  • Reviewed by City of Hollywood Building Division, (954) 921-3470

Typical Timeline

  • Feasibility + zoning review: 1–2 weeks
  • Architectural drawings + engineering: 4–8 weeks
  • Permit submission and review: 4–12 weeks (varies by jurisdiction)
  • Construction — garage conversion: 8–14 weeks
  • Construction — detached ADU: 16–28 weeks
  • Final inspections + CO: 1–3 weeks after construction complete

Cost Variables to Know

  • Sewer tap fees: $3,000–$12,000 depending on municipality
  • Impact fees: $5,000–$18,000 for new detached ADU in Broward County
  • Architectural drawings: $4,000–$12,000 (included in our scope)
  • Structural engineering: $2,000–$6,000 (included in our scope)
  • Permit fees: $1,500–$6,000 (included in our scope)

Common Use Cases

  • Rental income unit — single-family neighborhoods in Hollywood Hills and Emerald Hills
  • In-law or family suite — Lakes Section and Hollywood Lakes primary homes
  • Home office + guest space combo — Liberia and Boulevard Heights
  • Investment property ADU add — increasingly common given Hollywood's strong rental market

Hollywood's biggest trap isn't the building code — it's the geography. Because so much of the city sits on or near the barrier island and the Intracoastal Waterway, the first question on every Hollywood inquiry is whether the parcel falls inside the Coastal Construction Control Line, not what the unit will cost. We run that check in week one, before a single drawing is started.

Once the site clears, the HVHZ wind code and the 1,000 sq ft / 50% size cap are what shape the design. NOA-rated windows and doors are required on every opening, and setbacks tighten fast on narrow coastal lots. We price the real number against your specific parcel before you sign anything.

Service Area

ADU & garage conversions throughout Hollywood, FL

From the Lakes Section to Hollywood Hills — Hollywood is part of our Broward County market, backed by 10+ years of licensed GC experience in South Florida.

Hollywood HillsEmerald HillsHollywood LakesLakes SectionLiberiaBoulevard Heights
Real South Florida Clients

What property owners say about our ADU work

Verified reviews from ADU and garage conversion projects across South Florida.

★★★★★

"Dariceli told us upfront that our HOA would need to approve before any drawings were started. We got approval first, then permitted, then built. CO in hand 7 months after we first called. The process was exactly what she described."

KP

Karen P.

Palm Beach Gardens — Detached ADU, 640 sq ft

★★★★★

"Garage conversion in Lake Worth. D&Co handled the drawings, the permit, all the trades, and the CO. My son moved in within 4 months. The biggest thing was knowing the full cost upfront — no surprises on impact fees or utility hookups."

FG

Frank G.

Lake Worth — Garage Conversion to ADU

★★★★★

"I rent the unit out for $2,100/month. The total project cost was $78,000. I had two other contractors tell me they 'couldn't guarantee a CO.' D&Co was the only one who built it into the contract. That mattered more than the price."

RN

Rachel N.

Boynton Beach — Detached ADU, 520 sq ft rental

Common questions

What Hollywood homeowners ask about ADUs

The process, the cost, what needs a permit, and what makes an ADU legal to rent in Broward County.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬