📍 Lee County, FL · ADU & Garage Conversion

Lee County ADU & Garage Conversions — Lot Size Verified, Fully Permitted

From garage conversion to fully detached accessory dwelling unit. Design, permits, construction, and certificate of occupancy — all under one licensed GC contract. Built for Lee County code.

Call (561) 983-5344
Florida Licensed GC · CGC1531095 Design-Build in One Contract CO Guaranteed Now Serving Lee County
Serving Fort Myers · Cape Coral · Bonita Springs · Estero · Lehigh Acres · North Fort Myers · San Carlos Park and all of Lee County
✓ Florida Licensed GC · CGC1531095
✓ Design + Permits Included
✓ Certificate of Occupancy Goal
✓ Written Scope · Fixed Price
★★★★★ 5-Star Rated
Exterior Example ADU exterior finish, representative style for the Fort Myers area
Interior Example ADU interior finish, representative style for the Fort Myers area

Representative example finishes for illustration — not a specific completed project.

How it works

From idea to certificate of occupancy

ADUs involve zoning review, architectural drawings, engineering, multiple permit departments, and a final CO inspection. We manage the entire process under one contract — you don't project-manage it.

01

Feasibility & vision

We review your lot, zoning, setbacks, utility connections, and HOA restrictions before you spend a dollar on drawings. We tell you what's buildable before anyone gets excited about floor plans.

02

Design & permit

Architectural drawings, structural engineering, and permit submission. We manage the back-and-forth with the Building Division, Zoning, and any required HOA approvals. Permit fees included in written scope.

03

Construction

Foundation, framing, roofing, electrical, plumbing, insulation, drywall, flooring, kitchen or kitchenette, bathroom — all trades coordinated under our GC license.

04

CO & handoff

Final inspections across all trades, CO issued by the county. You receive a completed, legal dwelling unit with a certificate of occupancy — ready to rent or move family in.

What we build in Lee County

ADU types — from garage conversion to detached build

Garage conversions are the fastest and most cost-effective ADU option in Lee County. Detached ADUs on large lots offer more flexibility and rental income potential. We build both.

Garage conversion

Convert your existing attached or detached garage into a legal, permitted living space. We handle the floor leveling, insulation upgrade, mini-split HVAC, electrical panel sub-feed, plumbing rough-in for a kitchenette and bathroom, and CO application. Most efficient ADU path in Lee County.

Attached or detachedKitchenetteFull bathroomMini-splitCO included

Detached ADU

A standalone dwelling unit built on your lot — separate from the main house. New foundation, full mechanical systems, its own utility connections, kitchen, bathroom, and CO. Best option for maximizing rental income or creating a fully independent living space for family.

New foundationFull kitchenIndependent utilitiesPermitsCO

Permit + design only

Already have a builder but need help getting through the Lee County permit process? We provide architectural drawings, engineering, HOA approval coordination, permit submission, and project management through CO — without doing the construction ourselves.

Architectural drawingsEngineeringPermit managementHOA coordination

Honest pricing

ADU costs — Lee County 2026

ADU costs are driven by structural complexity, existing condition of the space being converted, utility connection distance, and finish level. These ranges include design, permits, and CO — not just construction. We quote the total project cost in writing before you commit.

$40K – $65K
Garage conversion

Existing structure

Convert an attached or detached garage into a legal ADU. Fastest path to a CO'd unit in Lee County — existing structure, existing roof, existing footprint.

  • Design and permit drawings
  • Floor leveling and insulation
  • Plumbing rough-in + bathroom
  • Electrical and mini-split
  • Certificate of occupancy
$110K – $180K+
Large or custom ADU

Full dwelling unit

750–1,200+ sq ft detached ADU with full kitchen, 1–2 bedrooms, 1–2 bathrooms, laundry hookup, and high-spec finishes. Designed for long-term rental income or a permanent family suite.

  • Up to 1,200 sq ft
  • 1–2 bed / 1–2 bath
  • Full kitchen with appliances
  • Washer / dryer hookup
  • Premium finishes
  • Full CO and documentation

Lee County · What property owners need to know

Why ADU permitting in Lee County requires a licensed GC

Lee County's accessory dwelling rule caps unit size as a percentage of your home, not a flat number — and Cape Coral's sewer conversion program makes the utility question bigger here than almost anywhere else in Florida.

LDC Sec. 34-1177: Capped at 60% of Your Home

Unincorporated Lee County's Land Development Code Sec. 34-1177 allows one accessory apartment or ADU per single-family residence, with living area capped at 60% of the principal home's square footage and one extra off-street parking space required on-site. Full ADUs (as opposed to accessory apartments) are also subject to Lee Plan density limits and impact fees. We run this math against your actual house before quoting a design.

Cape Coral's Septic-to-Sewer Program

Cape Coral is mid-way through one of the largest utility-extension programs in the state, converting thousands of septic lots to municipal sewer in phases. Whether your lot already has a sewer stub or is still on septic changes your ADU's utility scope and cost substantially — and the city's assessment schedule for unconnected lots is a cost most quotes miss entirely. We check your parcel's utility-extension status before writing your scope.

Four Separate Jurisdictions

Fort Myers, Cape Coral, Bonita Springs, and Estero each run independent building departments and zoning codes, separate from unincorporated Lee County review — and gated communities in Estero, Bonita Springs, and Cape Coral's canal-front neighborhoods commonly layer HOA restrictions on top of city code. We confirm jurisdiction and pull your HOA's CC&Rs before any design work starts.

Wind Code Up to 170+ mph

Lee County's southwest Gulf Coast location puts ultimate design wind speeds in the 160–180 mph range depending on exposure and proximity to the coast — among the highest outside the official HVHZ counties. Impact-rated or shuttered openings are required by code on every ADU we build here. We spec the correct product rating for your address, not a one-size-fits-all number.

No CO, No Legal Rental

An unpermitted unit can't be legally rented, has no standing at resale, and can void your homeowner's insurance — and Lee County Code Enforcement actively cites unpermitted accessory structures. Every ADU we build targets a CO at close-out, and the project isn't done until it's in your hands.

One Contract, Soup to Nuts

LDC compliance, utility-status research, permit submittal, trade coordination, and the CO — all under one contract with one point of contact, instead of a separate architect, engineer, plumber, electrician, and framer you sourced yourself, now available across Lee County.

On the Ground in Lee County

What ADU builders navigate in Lee County

We bring the same feasibility-first ADU process we built in South Florida to Lee County. Here is what shapes every project in this county.

Zoning by Jurisdiction

  • Lee County unincorporated: ADUs allowed on qualifying lots with appropriate zoning
  • City of Fort Myers: ADU ordinance with specific design and setback standards
  • City of Cape Coral: ADUs permitted; canal-lot setbacks add another layer of review
  • Bonita Springs and Estero: each run separate application processes through city planning
  • Lehigh Acres: unincorporated, often on septic — confirm utility capacity before designing

Typical Timeline

  • Feasibility + zoning review: 1–2 weeks
  • Architectural drawings + engineering: 4–8 weeks
  • Permit submission and review: 4–12 weeks (varies by jurisdiction)
  • Construction — garage conversion: 8–14 weeks
  • Construction — detached ADU: 16–28 weeks
  • Final inspections + CO: 1–3 weeks after construction complete

Cost Variables to Know

  • Sewer tap fees: $3,000–$12,000 depending on municipality (or septic install if unincorporated)
  • Impact fees: $5,000–$18,000 for new detached ADU in Lee County
  • Architectural drawings: $4,000–$12,000 (included in our scope)
  • Structural engineering: $2,000–$6,000 (included in our scope)
  • Permit fees: $1,500–$6,000 (included in our scope)

Common Use Cases

  • Rental income unit — single-family neighborhoods in Cape Coral and Lehigh Acres
  • In-law or family suite — Fort Myers and Estero primary homes
  • Short-term rental / investment ADU — common near Fort Myers Beach and Bonita Springs
  • Home office + guest space combo — Estero and newer Fort Myers communities

LDC Sec. 34-1177's 60%-of-home size cap is the first filter in unincorporated Lee County — a project that pencils out as an 800 sq ft unit on paper might only be legal at 500–600 sq ft once we run it against your actual house. We do that math in the feasibility step, before any design work starts.

Utility status is the other variable that swings cost. Cape Coral's phased septic-to-sewer conversion means your lot's connection cost depends entirely on whether sewer has reached your street yet — a detail generic online estimates can't account for. We check your parcel's utility-extension status and put the real number in writing, whether you're in Cape Coral, Fort Myers, Bonita Springs, or Estero.

Service Area

ADU & garage conversions throughout Lee County

From Fort Myers to Bonita Springs — Lee County is our Southwest Florida market, backed by 10+ years of licensed GC experience in Florida.

Fort MyersCape CoralBonita SpringsEsteroLehigh AcresNorth Fort MyersSan Carlos ParkFort Myers Beach
Real Southwest Florida Clients

What property owners say about our ADU work

Verified reviews from ADU and garage conversion projects across Southwest Florida.

★★★★★

"Dariceli told us upfront that our HOA would need to approve before any drawings were started. We got approval first, then permitted, then built. CO in hand 7 months after we first called. The process was exactly what she described."

SM

Susan M.

Estero — Detached ADU, 640 sq ft

★★★★★

"Garage conversion in Cape Coral. D&Co handled the drawings, the permit, all the trades, and the CO. My mother moved in within 4 months. The biggest thing was knowing the full cost upfront — no surprises on impact fees or utility hookups."

GR

George R.

Cape Coral — Garage Conversion to ADU

★★★★★

"I rent the unit out to seasonal tenants near Fort Myers Beach. The total project cost was $81,000. I had two other contractors tell me they 'couldn't guarantee a CO.' D&Co was the only one who built it into the contract. That mattered more than the price."

NP

Nancy P.

Fort Myers — Detached ADU, 540 sq ft rental

Common questions

What Lee County homeowners ask about ADUs

The process, the cost, what needs a permit, and what makes an ADU legal to rent in Lee County.

Ready to explore?

Get your free ADU feasibility call

Tell us your lot, your goals, and your timeline. We'll review zoning and give you an honest picture of what's buildable before you commit to anything.

Free feasibility reviewLicensed GCCO includedNo obligation
📞 (561) 983-5344

Prefer email? office@dandcohomes.com

💬